aKross
aKrossInformation Technology
+971 55 930 0437Book Consultation

Service Category

Fiber Optic Cabling & Structured Networks

End-to-end fiber optic cabling, structured cabling, and certified data network installation across the UAE — designed and deployed by aKross-certified engineers for office fit-outs, data centres, warehouses, and multi-tenant buildings.

6 Services Available

Click Any Service to See Full Details

Turnkey fiber optic cable installation across Dubai, Abu Dhabi, Sharjah, and the wider UAE. We handle indoor and outdoor single-mode (OS2) and multi-mode (OM3 / OM4 / OM5) deployments for enterprise campuses, data centres, warehouses, retail chains, and multi-tenant commercial buildings. Every project includes route survey, cable pulling, splicing, termination, OTDR/insertion-loss testing, and lifetime-warrantied certification documentation.

Key Features

  • OS2 single-mode and OM3/OM4/OM5 multi-mode fiber
  • Indoor riser, plenum, and outdoor armoured cabling
  • Fusion splicing with low-loss certified joints
  • OTDR testing with full link-loss reports
  • Trunk, backbone, and inter-building runs
  • Hot-aisle / cold-aisle data centre fiber routing
  • Pre-terminated MTP / MPO trunk solutions
  • Compliance with TIA-568, ISO/IEC 11801, BICSI

Technologies

Corning, CommScope, Panduit, BeldenFluke OTDR & Versiv CertifiersSumitomo / Fujikura splicing kitsMTP/MPO pre-term trunksLSZH / OFNP / OFNR jacketed fiber

Our Process

01Site Survey & Route Design
02BoM & Vendor Selection
03Cable Pulling & Pathway Build
04Splicing & Termination
05OTDR & Loss Testing
06Documentation & Handover
0725-Year Manufacturer Warranty

Who Is This For?

Office fit-outs, data centres, hospitals, hotels, retail chains, warehouses, schools, and government facilities upgrading or deploying high-bandwidth fiber networks.

Complete structured cabling deployments using shielded and unshielded Cat6, Cat6a, Cat7, and Cat8 systems for offices, hospitals, hotels, and warehouses across the UAE. We deliver TIA-568 / ISO 11801 compliant horizontal and backbone cabling with permanent-link certification on every drop — guaranteeing 10/40 Gigabit Ethernet readiness and a 25-year manufacturer warranty.

Key Features

  • Cat6, Cat6a, Cat7, Cat8 shielded and unshielded
  • Permanent-link Fluke DSX certification per drop
  • Patch panels, racks, and cable management
  • Wall outlets, floor boxes, and consolidation points
  • PoE+ / PoE++ ready for IP cameras, APs, and VoIP
  • 10G / 40G ready backbone trunks
  • Compliance with TIA-568, ISO/IEC 11801, BICSI
  • 25-year manufacturer system warranty

Technologies

Panduit, Belden, CommScope SYSTIMAX, LegrandFluke DSX-8000 CableAnalyzerCat6a STP / FTP / U/UTPPoE+ / 802.3bt PoE++ infrastructure

Our Process

01Requirements Workshop
02Cable Plant Design
03Pathway Installation
04Drop Pulling & Termination
05Permanent-Link Certification
06As-Built Documentation
07Warranty Registration

Who Is This For?

New office fit-outs, building refurbishments, hotels, hospitals, government facilities, and any UAE business needing a future-proof network backbone.

Specialist data centre cabling for enterprise server rooms, colocation halls, and edge sites across the UAE. We design and deploy high-density MTP/MPO fiber trunks, ToR (top-of-rack) and EoR (end-of-row) topologies, MDA/HDA distribution, hot-aisle / cold-aisle containment, and overhead pathway systems aligned to TIA-942, BICSI 002, and Uptime Institute Tier requirements.

Key Features

  • Pre-terminated MTP / MPO 12 / 24 fiber trunks
  • ToR, EoR, and EDA / MDA / HDA topologies
  • Hot-aisle / cold-aisle containment integration
  • Overhead and underfloor pathway systems
  • Power and data cable segregation
  • TIA-942 Rated 1–4 design alignment
  • Cabinet builds, PDUs, and cable management
  • Real-time DCIM-ready labeling and documentation

Technologies

Panduit QuickNet / HD FlexCommScope SYSTIMAX 360 / InstaPATCHCorning EDGE8 / EDGE SolutionsTate / Subzero containment systemsUptime Institute Tier guidelines

Our Process

01Tier-Aligned Capacity Planning
02Cabinet & Pathway Layout
03MTP/MPO Trunk Pre-Term
04Rack Build & Cable Routing
05100% Link Certification
06Labeling & DCIM Sync
07Operational Handover

Who Is This For?

Enterprises and operators building or expanding on-premise data centres, server rooms, telecom equipment rooms, and edge compute sites.

Field-services for fiber fusion splicing, mechanical splicing, connector termination, and OTDR / insertion-loss / chromatic-dispersion certification. We support new builds, MAC (move-add-change) work, and emergency restoration with 24/7 mobile splicing teams across Dubai, Abu Dhabi, and the Northern Emirates.

Key Features

  • Fusion splicing — single & ribbon fiber
  • Field-installable LC / SC / MPO connectors
  • OTDR bi-directional certification
  • Insertion loss & ORL testing
  • Cable fault location and repair
  • 24/7 emergency restoration teams
  • Detailed test reports per IEC 61280
  • Documented as-built cable plant database

Technologies

Fujikura 90S / 70S+ splicersSumitomo Q102-CA splicersFluke Versiv2 / OptiFiber Pro OTDREXFO MAX-720 series

Our Process

01Pre-Splice Inspection
02Cable Preparation
03Fusion Splicing
04Connector Termination
05OTDR Bi-Dir Testing
06Insertion-Loss Verification
07Certified Reports

Who Is This For?

Operators, telcos, ISPs, and enterprise customers needing certified splicing, MAC work, or 24/7 emergency fiber restoration.

Passive optical network (PON) and FTTH / FTTB / FTTR deployments for residential towers, hotels, hospitals, and gated communities across the UAE. We handle riser fiber, MDU splitters, GPON/XGS-PON OLT/ONU integration, and full IPTV / Wi-Fi / VoIP service-ready cabling — coordinated with Etisalat and du fiber-to-the-building handover specifications.

Key Features

  • GPON, XGS-PON, and FTTR architectures
  • Riser, lateral, and in-suite fiber distribution
  • 1×8 / 1×16 / 1×32 splitter cabinet builds
  • Etisalat & du handover-ready specs
  • IPTV, VoIP, and managed Wi-Fi readiness
  • MDU / MTU patch and ONU enclosures
  • Acceptance testing per operator standards
  • Project-managed turnover documentation

Technologies

Huawei / Nokia / ZTE GPON OLT/ONUCorning Optitap / FlexNAPPre-connectorized SC/APC drop cableOperator-specific MDU patch panels

Our Process

01Master Plan Coordination
02Riser & Lateral Design
03Splitter Cabinet Builds
04Drop Cable Installation
05OLT / ONU Commissioning
06Operator Handover Testing
07Tenant Activation Support

Who Is This For?

Real estate developers, hotel owners, hospital operators, and master-community developers deploying fiber-to-the-unit infrastructure.

Independent audit and re-certification of existing fiber and copper cable plants. We physically inspect, label, OTDR-test, and Cat-certify every link, then deliver a clean as-built database, performance report, and remediation plan — extending manufacturer warranty coverage and exposing hidden bottlenecks before they cause outages.

Key Features

  • Full physical and logical link audit
  • OTDR & DSX permanent-link re-certification
  • Patch-panel, cabinet, and drop labeling
  • As-built CAD and rack-elevation drawings
  • Performance and risk remediation report
  • Manufacturer warranty re-registration
  • Compliance gap analysis (TIA-568, ISO 11801)
  • Asset and capacity planning recommendations

Technologies

Fluke DSX & OptiFiber ProVisio / AutoCAD documentationCable management asset databases

Our Process

01Site Audit
02Physical Inspection
03Performance Testing
04Documentation
05Gap Analysis
06Remediation Plan
07Re-Certification Sign-off

Who Is This For?

Businesses inheriting legacy cabling, expanding office space, or preparing for IT refresh / data centre upgrade projects.

FAQ

Common Questions

How long does a fiber cabling project take in the UAE?

A 50-drop office cabling project typically takes 5–10 working days from kick-off to certified handover. Larger fit-outs (200+ drops or multi-floor) take 3–6 weeks. Data centre and FTTH projects are scoped individually based on cable counts and authority approvals.

Do you provide certified test reports for every link?

Yes. Every fiber link is OTDR-tested bi-directionally and every copper drop is permanent-link certified using Fluke DSX-8000. You receive a complete PDF and CSV report database, an as-built CAD plan, and warranty registration with the manufacturer.

What manufacturer warranty do you offer on structured cabling?

All certified cabling carries a 25-year manufacturer system warranty (Panduit, CommScope SYSTIMAX, Belden, or Legrand) covering both components and channel performance — provided installation is performed by certified installers, which we are.

Can you handle fiber pulling between buildings or across a campus?

Yes. We deliver outdoor armoured single-mode fiber with civil works (trenching, ducting, manholes), aerial fiber where permitted, and FTTB hand-off into building MMRs — coordinated with municipality, RTA, and developer approvals.

Do you support emergency fiber restoration?

We operate 24/7 mobile splicing teams across Dubai, Abu Dhabi, and Sharjah for fiber cuts and link outages. Standard SLA response is within 2–4 hours of dispatch with full splice and OTDR verification before service handback.

Begin the Transformation

Engineer a future without compromise.

Schedule a confidential 45-minute strategic consultation with the aKross executive counsel — a thoughtful, non-commercial conversation about your enterprise's next decade.

Reserve a Consultation+971 55 930 0437
Confidential consultation
Executive response within 2 hours
200+ enterprise clients
Sovereign data residency